Wind Energy in Estugarda

Rendimento anual

11.746

kWh/Jahr

Período de amortização

12

Jahre

Economia de CO₂

4.5

t CO₂/Jahr

Example: 5 kWp system, country average values

Perguntas frequentes sobre Estugarda

How much electricity does a 10 kW wind turbine produce in Estugarda?

With a capacity factor of 13%, a 10 kW turbine in Estugarda generates approximately 11746 kWh per year.

How much does a small wind turbine cost in Estugarda?

A 10 kW wind turbine in Estugarda typically costs around €18,000 including installation.

What is the payback period for a wind turbine in Estugarda?

Given local wind conditions, the payback period is approximately 12 years.

How much CO₂ does a wind turbine save in Estugarda per year?

A 10 kW wind turbine in Estugarda avoids approximately 4.5 tonnes of CO₂ per year.

Wie berechnen wir das?

Daten: Global Wind Atlas 3.3. Berechnungen sind Schätzwerte für eine Beispielanlage.

Potencial eólico para Estugarda

Check wind potential for Estugarda